Conveyancing / Tenancy / Land Environmental / Energy Law

A Practical Guide to the Law on Using Commercial Property for Electric Car Charging and Solar and Wind Power 2nd Edition

By Alastair Frew
Law Brief Publishing July 2024

Specifications

ISBN-13
9781916698376
Publisher
Law Brief Publishing
Publication
July 2024
Format
Paperback
Jurisdiction
U.K. ? Countri(es) for reference only

Details

Electric cars are now a common sight and will soon be ubiquitous, but where do you re-charge them? Property owners can benefit from the coming boom in electric car usage by installing charging points on their land. Property owners can also benefit from the green energy revolution by developing solar or wind electricity generating facilities.

The National Grid also needs countless additional facilities to convert all this new electricity into useable voltages, and places to store any surplus electricity until it is needed.

This book guides the property lawyer through the documentation using straightforward language, and provides useful drafting tips. It will prove to be a valuable guide to every practitioner who has to give advice to property owners looking to make the most of the changing energy market.

This revised edition adds new drafting notes and specimen clauses as well as a new chapter about solar farm development.

Table of Contents

Introduction

Chapter 1 – What is “Renewable Energy?”

Chapter 2 – Electric Cars

Chapter 3 – EV Charging Points
Installation of EV Charging Points on Commercial Premises
Exclusivity Agreement or Option?
Works Compounds
The Lease itself
Planning Permission and Building Regulations for electric vehicle charging points
New Electrical standards for the earthing of EV charging points
The future for electric vehicle charging stations?
Substations
The Grid Connection – Form G99

Chapter 4 – Where Will All the Electricity Come From?
Load factors and low inertia
Battery storage
Hydrogen
Wind Turbines
Anaerobic Digestion
Gas Reserve Power Stations
Solar Panels (Photovoltaic – PV Panels)
Power Purchase Agreements
Solar Farms

Chapter 5 – Grants and Subsidies
Grant funding
Subsidies
HKD 699.86

Inclusive of HK delivery

Ready to ship
Delivery Time: around 4-5 weeks
Extra 2-10 working days if shipping address outside Hong Kong
  • Free HK shipping over HK$1,000
  • International shipping to 35+ countries
Order Form
Save

Recommended

You may also be interested in these books:

More titles from Conveyancing / Tenancy / Land

View all